Primary line construction is performed to supply water, water drainage and compressed air to booths. Construction inside booths is Secondary Construction and is performed for a fee to be paid by the exhibitor.
Water Supply and Drainage
- Supply pipe diameters: 13mmφ, 20mmφ
- Drainage pipe diameters: 40mmφ
- Water pressure: 0.18 Mpa–0.2 Mpa
*Contact the Management Office if other specifications are required.
Construction on 1 location | ¥77,000 *Pipe-laying inside booths and connecting machines are extra. |
Maintenance during the show | ¥5,500 |
Water consumption fee | ¥1,100 / m3 |
Compressed Air
- Piping apertures: 1/2", 3/8", 1/4"
- Pressure: 0.7 Mpa
*Contact the Management Office if other specifications are required.
Construction on 1 location | ¥88,000 *Pipe-laying inside booths are and connecting machines extra. |
Maintenance during the show | ¥5,500 |
-
CExhibition Venue Regulations
-
C1 Exhibition Site
-
C2 On-site Management
- Important 1. Work Schedule
- Important 2. Exhibitor Badges, Worker Ribbons
- 3. On-site Photography
-
C3 Load-In & Load-Out
- Important 1. Vehicle Stickers
- Important 2. Load-In
- 3. Vehicles during the show
- Important 4. Load-Out
-
C4 Waste Disposal