D1
Booth Standards 5. Ceiling Structure Applicable
- Application No.8
- DeadlineSeptember 06
Exhibitors who wish to set up ceiling structures, without regard to the size, are required to submit the Application for Ceiling Structure 〈No.8〉 and both top and elevated view booth drawings to Makuhari Messe by Friday, September 6. If the preparation of drawings misses the deadline, the exhibitor should submit Application for Ceiling Structure 〈No.8〉 alone by Friday, September 6 to let Makuhari Messe know that the booth will have a ceiling structure.
Instructions and regulations of ceiling structures
Structure
- Any double layer structure is prohibited.
- All the decorating materials must be fire-resistant processed and attached the fire-resistant indications.
- Exhibitors are required to submit both top (designated ceiling area and its size) and elevated view (designated ceiling area and surrounding wall, etc.) booth drawings. They must show that the ceiling are fire-resistant processed.
Fire Safety Equipment
- Fire extinguishes must be 10-size or bigger.
- Fire alarms (smoke alarms) may be required. In such case, exhibitor must submit the placement notice and its operation experiment result to CEATEC. Domestic fire alarms cannot be accepted.
- Depending on the structure or size, evacuation exits and leading light for emergency may be necessary.
-
CExhibition Venue Regulations
-
C1 Exhibition Site
-
C2 On-site Management
- Important 1. Work Schedule
- Important 2. Exhibitor Badges, Worker Ribbons
- 3. On-site Photography
-
C3 Load-In & Load-Out
- Important 1. Vehicle Stickers
- Important 2. Load-In
- 3. Vehicles during the show
- Important 4. Load-Out
-
C4 Waste Disposal