D2
Booth Display Regulations 3. Floor Construction Work Applicable
- Application No.11
- DeadlineSeptember 06
Also, please comply with the following items regarding construction.
Floor Construction Work
- Only hole-in anchors (a.k.a. grip anchors) with a length of 80 mm or less may be used.
- Concrete nails and jackhammering are prohibited.
- Pit caps and placement in pits are prohibited. Also, the concrete must be placed at least 200 mm away from the edge of the pit. Please note that any violations will result in a separate repair fee.
- If you would like a pit drawing showing the location of the pit in your booth, please contact Fujiya Co., Ltd.
- To prevent truss beams falling, strike four or more anchor bolts in one place when securing them to the floor.
- Exhibitors are required to contact the Construction Counter in each hall before commencing the work and inform the number of anchor bolts to be affixed.
*In case there is no need of anchor bolts, exhibitors are required to submit the cancellation
Restoration to original condition
Floor construction work is permitted on the condition that all flooring will be restored to its original state after the show. For restoration, if the head protrudes above the floor surface, cut it off with a sander to a horizontal plane so that no protrusions remain on the floor surface. The heads may never be hammered in or cut with acetylene torches. All expenses for restoration shall be borne by the exhibitor. In the event that the exhibitor has not fully restored the exhibition to its original state, or has not restored the exhibition to its original state by the time of removal, and the secretariat has no choice but to take over the work, the exhibitor will be responsible for all expenses incurred in restoring the exhibition to its original state. The Management Office (Fujiya Co., Ltd.) will charge you for repairs separately.Floor restoration expenses
Fujiya Co. Ltd., will charge a flat fee of 1,100 JPY (including consumption tax) for each poured pavement, regardless of its thickness, as a floor restoration cooperation fee after the exhibition.-
CExhibition Venue Regulations
-
C1 Exhibition Site
-
C2 On-site Management
- Important 1. Work Schedule
- Important 2. Exhibitor Badges, Worker Ribbons
- 3. On-site Photography
-
C3 Load-In & Load-Out
- Important 1. Vehicle Stickers
- Important 2. Load-In
- 3. Vehicles during the show
- Important 4. Load-Out
-
C4 Waste Disposal