Booth Display Regulations 5. Electrical Power Supply Required
- Application No.3
- DeadlineSeptember 13
Electrical power supply application
If electrical power is required inside a booth, the exhibitor must submit to IIDA Electrical Works Co., Ltd. the Application for Electrical Power Supply <No.3> by Friday, September 13, with voltage/phase requirements clearly indicated. If a compressor is used, the exhibitor is requested to fill in the necessary requirements on the form, and to soundproof the compressor area so as to avoid inconveniencing other exhibitors. The Management Office will install the total switch based on the data. Exhibitors are required to correctly enter data, which cannot be changed later. The capacity required (watts) should be rounded up to the nearest thousand. Please state in kilowatts. (Example:1.4 kW→2 kW) Please ensure it is filled out correctly and submitted before the deadline.Exhibitors who have ordered the package displays are not required to submit the Application for Electrical Work, and the Display Contractor Registration because these applications are submitted by the contractors in charge.
Electricity work (primary mains work)
The Management Office will provide electrical facility construction services according to the fees listed below and based on the contents of the Application for Electrical Power Supply. One circuit breaker will be prepared for the booths of exhibitors submitting this form.*For safety reasons, the outlet should not be decorated or covered in any way.
Payment for the cost of primary mains work and electricity rates.
The invoices for cost of primary mains work and electricity rates are issued by IIDA Electrical Works Co., Ltd. after the period. Please confirm the details and pay to IIDA Electrical Works Co., Ltd. For overseas exhibitors and/or the small payment, the staffs by IIDA Electrical Works Co., Ltd. will visit their booths during the show. The payment is available in cash or by credit card.Electricity rates
You are required to pay the cost of primary mains work and electricity rates depending on the electricity capacity you need. ¥13,200 per 1 kW (including consumption tax)Electrical construction work in booth
Exhibitors must carry out electrical construction work, such as distribution boards, lights, fluorescent lights, and sockets, after the circuit breaker has been installed by the Management Office. For the safety of the booth during the exhibition period, exhibitors must take measures such as keeping an engineer at the booth at all times. Earth-leakage circuit breakers must be equipped with the distribution boards in the booth.Electrical work in booths
- Power transmission to booths 2:00 p.m. on October 13 *However, transmission may be delayed depending on the progress of work in neighboring booths.
- Termination of power 5:30 p.m. on October 18
Other Considerations
- Protective equipment (backup)
The Management Office cannot be responsible for any damage to exhibits caused by accidental power failure or voltage drops. For exhibits requiring constant voltage and/or frequency (the voltage in each booth will be 100V±5%), exhibitors are required to install necessary back-up equipment (power supply stabilizing units, etc.). - Electrician licensing
Contractors carrying out electrical work in booths must carry their licenses with them at all times. Unlicensed workers or those who fail to carry their licenses will be ordered to stop work. - Observing electrical standards
Electrical work in each booth must be carried out in accordance with electrical standards (internal electrical regulations).
IIDA Electrical Works Co., Ltd. Person in charge of foreign exhibitors: Wang, Yamazaki
1-8-21, Shinkiba, Kotoku, Tokyo 136-0082
Tel:+81-3-3521-3522 Fax:+81-3-3521-3699 E-mail:ceatec2023@iidae.co.jp
1-8-21, Shinkiba, Kotoku, Tokyo 136-0082
Tel:+81-3-3521-3522 Fax:+81-3-3521-3699 E-mail:ceatec2023@iidae.co.jp
-
CExhibition Venue Regulations
-
C1 Exhibition Site
-
C2 On-site Management
- Important 1. Work Schedule
- Important 2. Exhibitor Badges, Worker Ribbons
- 3. On-site Photography
-
C3 Load-In & Load-Out
- Important 1. Vehicle Stickers
- Important 2. Load-In
- 3. Vehicles during the show
- Important 4. Load-Out
-
C4 Waste Disposal